The Ontario Feed-In Tariff (FIT)

Ontario is being heralded globally for its environmentally proactive Feed-In Tariff (FIT, formerly RESOP: Ontario's Renewable Energy Standard Offer Program). This program follows the model of other successful European incentive programs, and offers an incentive for electricity generated from renewable sources (such as wind, water, or biofuels), plus a bonus for local ownership and/or local content. Incentives range from $0.103/kWh for landfill gas to $0.135/kWh for wind up to $0.802/kWh for house-scale solar PV. Mindscape's consulting team specializes in unlocking the mysteries of this program and in minimizing risk for our clients.

Several projects in Ontario have been cancelled or rendered financially unfeasible because connection and environmental requirements were not fully considered in advance. Mindscape's specialists can mitigate your project connection and environmental impact risks and help ensure that your project is successful.

Prequalification and Initial Feasibilty Services:

  • Investigation of local project limitations such as zoning bylaws and permitting requirements;
  • Verification of Environmental Impact Assessment requirements and local conservation authority requirements;
  • Investigation of local utility connection requirements.

Risk Mitigation Services:

  • Management of utility relationships and connection negotiations, including coordination with the Electrical Safety Authority (ESA) Plans Approval department;
  • Management of the Connection Impact Assessment (CIA) process;
  • Supporting owner's engineer with connection pre-designs;
  • Detailed definition and costing of the scope of any required Environmental Impact Assessments;
  • Cost-value studies for various assessments required, and final determination of whether required assessments or connection expenses may be prohibitive.

Project Implementation Services:

  • Environmental Impact Assessments or exemption letters;
  • Completing and filing FIT and related applications;
  • Evaluation of utility connection options, and support for detailed connection design.

Will you be able to connect?

What assessments do you need?

Will connection or assessment costs be prohibitive?
 

Let us help you mitigate your project risks BEFORE they inflate your project costs

If you or your clients are planning to take advantage of Ontario's Feed-In Tariff then let us help you minimize your project risk and maximize your potential for success. The FIT is a tremendous opportunity, and with Mindscape to guide you through the process, your renewable energy projects will be easier to realize then ever before.
 

Contact Us

Copyright 2006-present, Mindscape Innovations

Legal